مقالات

Zandieh, S.M.T. Fatemi Ghomi, S.M. Moattar Husseini (2006), An immune algorithm approach to hybr flow shops scheduling with sequence-dependent setup times, Applied Mathematics and Computation 180(1), 111-127.

Naderi, M. Zandieh, V. Roshanaei (2009), Scheduling hybrid flowshops with sequence-dependent setup times to minimize makespan and maximum tardiness, International Journal of Advanced Manufacturing Technology 41(11-12), 1186-1198.

Gholami, M. Zandieh, A. Alem-Tabriz (2009), Scheduling hybrid flow shop with sequence-dependent setup times and machines with random breakdowns, International Journal of Advanced Manufacturing Technology 42(1-2), 189-201.

Zandieh, M. Amiri, B. Vahdani, R. Soltani (2009), A robust parameter design for multi-response problems, Journal of Computational and Applied Mathematics230(2), 463-476.

Naderi, M. Zandieh, A. Khaleghi Ghoshe Balagh, V. Roshanaei (2009), An improved simulated annealing for hybrid flowshops with sequence dependent setup and transportation times to minimize total completion time and total tardiness, Expert Systems with Applications36(6), 9625-9633.

Zandieh, S. Molla-Alizadeh-Zavardehi (2009), Synchronizing production and air transportation scheduling using mathematical programming models, Journal of Computational and Applied Mathematics 230(2), 546-558.

Behnamian, M. Zandieh, S.M.T. Fatemi Ghomi (2009), Parallel-machine scheduling problems with sequence-dependent setup times using an ACO, SA and hybrid with VNS algorithm, Expert Systems with Applications 36(6), 9637-9944.

Behnamian, S.M.T. Fatemi Ghomi, M. Zandieh (2009), A multi-phase covering Pareto-optimal front method to multi-objective scheduling in a realistic hybrid flow shop using a hybrid metaheuristic, Expert Systems with Applications 36(8), 11057-11069.

Zandieh, B. Dorri, A.R. Khamseh (2009), Robust meta-heuristics for group scheduling with sequence-dependent setup times in flexible flow shops, International Journal of Advanced Manufacturing Technology 43(7), 767-778.

Naderi, M. Zandieh, S.M.T. Fatemi Ghomi (2009), Scheduling job shop problems with sequence-dependent setup times, International Journal of Production Research 47(21), 5959-5976.

Amiri, M. Zandieh, R. Soltani, B. Vahdani (2009), A hybrid multi-criteria decision-making model for firms competence evaluation, Expert Systems with Applications36(10), 12314-12322.

Behnamian, M. Zandieh, S.M.T. Fatemi Ghomi (2009), Due window scheduling with sequence-dependent setup on parallel machines using three hybrid metaheuristic algorithms, International Journal of Advanced Manufacturing Technology 44(7), 795-808.

Naderi, M. Zandieh, S.M.T. Fatemi Ghomi (2009), Scheduling sequence-dependent setup time job shops with preventive maintenance, International Journal of Advanced Manufacturing Technology 43(1-2), 170-181.

Zandieh, M. Gholami (2009), An immune algorithm for scheduling hybrid flow shop with sequence-dependent setup times and machines with random breakdowns, International Journal of Production Research 47(24), 6999-7027.

Jabbarizadeh, M. Zandieh, D. Talebi (2009), Hybrid flexible flowshops with sequence-dependent setup times and machine availability constraints, Computers and Industrial Engineering 57(3), 949-957.

Naderi, M. Zandieh, M.A.H.A. Shirazi (2009), Modeling and scheduling a case of flexible flowshops: total weighted tardiness minimization, Computers and Industrial Engineering57(4), 1258-1267.

Naderi, M. Zandieh, S.M.T. Fatemi Ghomi (2009), A study on integrating sequence dependent setup time flexible flow lines and preventive maintenance scheduling, Journal of Intelligent Manufacturing20(6), 683-694.

Gholami, M. Zandieh (2009), Integrating simulation and genetic algorithm to schedule a dynamic flexible job shop, Journal of Intelligent Manufacturing20(4), 481-498.

Naderi, S.M.T. Fatemi Ghomi, M. Aminnayeri, M. Zandieh (2010), A contribution and new heuristics for open shop scheduling, Computers and Operations Research 37(1), 213-221.

Naderi, R. Ruiz, M. Zandieh (2010), Algorithms for a realistic variant of flowshop scheduling, Computers and Operations Research 37(2), 236-246.

M.A. Adibi, M. Zandieh, M. Amiri (2010), Multi-objective scheduling of dynamic job shop using variable neighborhood search, Expert Systems with Applications 37(1), 282-287.

Roshanaei, M. M. Seyyed Esfehani, M. Zandieh (2010), Integrating non-preemptive open shops scheduling with sequence-dependent setup times using advanced metaheuristics, Expert Systems with Applications37(1), 259-266.

Amiri, M. Zandieh, B. Vahdani, R. Soltani, V. Roshanaei (2010)  An integrated eigenvector-DEA-TOPSIS methodology for portfolio risk evaluation in the FOREX spot Market, Expert Systems with Applications37(1), 509-516.

Yazdani, M. Amiri, M. Zandieh (2010), Flexible job-shop scheduling with parallel variable neighborhood search algorithm, Expert Systems with Applications37(1), 678-687.

Behnamian, S.M.T. Fatemi Ghomi, M. Zandieh (2010), Development of a hybrid metaheuristic to minimizing earliness and tardiness in hybrid flowshop with sequence-dependent setup times, International Journal of Production  Research48(5), 1415-1438.

Behnamian, M. Zandieh (2010), Due windows group scheduling using an effective hybrid optimization approach, International Journal of Advanced Manufacturing Technology46(5-8), 721-735.

Vahdani, R. Soltani, M. Zandieh (2010), Scheduling the truck holdover recurrent dock cross-dock problem using robust meta-heuristics, International Journal of Advanced Manufacturing Technology46(5-8), 769-783.

Bagheri, M. Zandieh, I. Mahdavi, M. Yazdani (2010), An artificial immune algorithm for the flexible job-shop scheduling problem, Future Generation Computing Systems26(4), 533-541.

H.R. Kia, H. Davoudpour, M. Zandieh (2010), Scheduling a dynamic hybrid flowshop with sequence-dependent setup times: a simulation analysis, International Journal of Production Research 48(14), 4019-4042.

Zandieh, M.A. Adibi (2010), Dynamic job shop scheduling using variable neighborhood search, International Journal of Production  Research48(8), 2449-2458.

Karimi, M. Zandieh, H. Karamooz (2010), Bi-objective group scheduling in hybrid flexible flowshop: A multi-phase approach, Expert Systems with Applications37(6), 4024-4032.

A.R. Boloori Arabani, S.M.T. Fatemi Ghomi, M. Zandieh (2010), A multi-criteria cross-docking scheduling with JIT approach, International Journal of Advanced Manufacturing Technology 49(5-8), 741-756.

Behnamian, M. Zandieh, S.M.T. Fatemi Ghomi (2010), A multi-phase covering Pareto-optimal front method to multi-objective parallel machine scheduling, International Journal of Production Research48(17), 4949-4976.

Vahdani, M. Zandieh (2010), Selecting suppliers using a new fuzzy multiple criteria decision model: the fuzzy balancing and ranking method, International Journal of Production Research48(18), 5307-5326.

Amiri, M. Zandieh, M. Yazdani, A. Bagheri (2010), A variable neighborhood search algorithm for the flexible job-shop scheduling problem, International Journal of Production Research48(19), 5671-5689.

Vahdani, M. Zandieh (2010), Scheduling the trucks in cross docking systems: Robust meta-heuristics, Computers and Industrial Engineering58(1), 12-24.

Rashidi, M. Jahandar, M. Zandieh (2010), An improved hybrid multi-objective parallel genetic algorithm for hybrid flowshop scheduling with unrelated parallel machines, International Journal of Advanced Manufacturing Technology49(9-12), 1129-1139.

Soltani, F. Jolai, M. Zandieh (2010), Two robust meta-heuristics for scheduling multiple job classes on a single machine with multiple criteria, Expert Systems with Applications37(8), 5951-5959.

Vahdani, A.H.K. Jabbari, V. Roshanaei, M. Zandieh (2010), Extension of the ELECTRE for decision-making problems with interval weights and data, International Journal of Advanced Manufacturing Technology50(5-8), 793-800.

Moradi, S.M.T. Fatemi Ghomi, M. Zandieh (2010), An efficient architecture for scheduling flexible job-shop with machine availability constraints, International Journal of Advanced Manufacturing Technology51(1-4), 325-339.

Moradi, M. Zandieh (2010), Minimizing the makespan and the system unavailability in parallel machine scheduling problem: A similarity based genetic algorithm, International Journal of Advanced Manufacturing Technology51(5-8), 829-840.

Torabzadeh, M. Zandieh (2010), Cloud theory-based simulated annealing approach for two-stage assembly scheduling, Advances in Software Engineering41(10-11), 1238-1243.

Forouharfard, M. Zandieh (2010), An imperialist competitive algorithm to schedule of receiving and shipping trucks in cross-docking systems, International Journal of Advanced Manufacturing Technology51(9-12), 1179-1193.

Zandieh, E. Mozaffari, M. Gholami (2010), A robust genetic algorithm for realistic hybrid flexible flow line scheduling problems, Journal of Intelligent Manufacturing 21(6), 731-743.

S.A. Seyed-Alagheband, S.M.T. Fatemi Ghomi, M. Zandieh (2011), A simulated annealing algorithm for balancing the assembly line problem type II with sequence-dependent setup times between tasks, International Journal of Production Research 49(3), 805-825.

Vahdani, M. Zandieh, R. Tavakkoli-Moghaddam (2011),  Two Novel FMCDM Methods for Alternative Fuel Buses Selection, Applied Mathematical Modeling35(3), 1396-1412.

Naderi, S.M.T. Fatemi Ghomi, M. Aminnayeri, M. Zandieh (2011), Scheduling open shops with parallel machines to minimize total completion time, Journal of Computational and Applied Mathematics235(5), 1275-1287.

A.R. Boloori Arabani, S.M.T. Fatemi Ghomi, M. Zandieh (2011), Meta-heuristics implementation for scheduling of trucks in a cross docking system with temporary storage, Expert Systems with Applications 38(3), 1964-1979.

Vahdani, M. Zandieh, V. Roshanaei (2011), A hybrid multi-stage predictive model for supply chain network collapse recovery analysis: a practical framework for effective supply chain network continuity management, International Journal of Production Research49(7), 2035-2060.

Nourmohammadi, M. Zandieh (2011), Assembly line balancing by a new multi-objective differential evolution algorithm based on TOPSIS, International Journal of Production Research 49(10), 2833-2855.

Sadeghi, A. Alem-Tabriz, M. Zandieh (2011), Product portfolio planning: A heuristic-based simulated annealing algorithm, International Journal of Production Research49(8), 2327-2350.

Moradi, M. Zandieh, I. Mahdavi (2011), Non-dominated Ranked Genetic Algorithm for a multiobjective mixed-model assembly line sequencing problem, International Journal of Production Research49(12), 3479-3499.

Shokrollahpour, M. Zandieh, B. Dorri (2011), A novel imperialist competitive algorithm for bi-criteria scheduling of the assembly flowshop problem, International Journal of Production Research 49(11), 3087-3103.

Zandieh, N. Karimi (2011), An adaptive multi-population genetic algorithm to solve the multi-objective group scheduling problem in hybrid flexible flowshop with sequence-dependent setup times, Journal of Intelligent Manufacturing22(6), 979-989.

Mirsanei, M. Zandieh, M.J. Moayed, M.R. Khabbazi (2011), A simulated annealing algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times, Journal of Intelligent Manufacturing22(6), 965-978.

Karimi, M. Zandieh, A.A. Najafi (2011), Group scheduling in flexible flow shops: A hybridised approach of imperialist competitive algorithm and electromagnetic-like mechanism, International Journal of Production Research 49(15-16), 4965-4977.

Sakiani, M. Zandieh, S.M.T. Fatemi Ghomi (2011), Corrigendum to “Genetic algorithm for supply planning in two-level assembly systems with random lead times” [Engineering Applications of Artificial Intelligence 22 (2009) 906-915], Engineering Applications of Artificial Intelligence 24(5), 917-918.

Naderi, S.M.T. Fatemi Ghomi, M. Aminnayeri, M. Zandieh (2011), A study on open shop scheduling to minimize total tardiness, International Journal of Production Research 49(15), 4657-4678.

Bagher, M. Zandieh, H. Farsijani (2011), Balancing of stochastic U-Type assembly lines: An imperialist competitive algorithm, International Journal of Advanced Manufacturing Technology 54(1-4), 271-285.

Naderi, S.M.T. Fatemi Ghomi, M. Aminnayeri, M. Zandieh (2011), Modeling and scheduling open shops with sequence-dependent setup times, International Journal of Advanced Manufacturing Technology 53(5-8), 751-760.

Naderi, M. Zandieh, M. Aminnayeri (2011), Incorporating periodic preventive maintenance into flexible flowshop scheduling problems, Applied Soft Computing 11(2), 2094-2101.

S.M. Mousavi, M. Zandieh, M. Amiri (2011) An efficient bi-objective heuristic for scheduling hybrid flowshops, International Journal of Advanced Manufacturing Technology 54(1-4), 287-307.

Khorshidian, N. Javadian, M. Zandieh, J. Rezaeian, K. Rahmani (2011) A genetic algorithm for JIT single machine scheduling with preemption and machine idle time, Expert Systems with Applications 38(7), 7911-7918.

Sadeghi, M. Zandieh (2011) A game theory-based model for product portfolio management in a competitive market, Expert Systems with Applications 38(7), 7919-7923.

Behnamian, M. Zandieh, S.M.T. Fatemi Ghomi (2011) Bi-objective parallel machines scheduling with sequence-dependent setup times using hybrid metaheuristics and weighted min-max technique, Soft Computing 15(7), 1313-1331.

Moradi, S.M.T. Fatemi Ghomi, M. Zandieh (2011), Bi-objective optimization research on integrated fixed time interval preventive maintenance and production for scheduling flexible job-shop problem, Expert Systems with Applications 38(6), 7169-7178.

Bagheri, M. Zandieh (2011), Bi-criteria flexible job-shop scheduling with sequence-dependent setup times -Variable neighborhood search approach, Journal of Manufacturing Systems 30(1), 8-15.

Moslemi, M. Zandieh (2011), Comparisons of some improving strategies on MOPSO for multi-objective (r, Q) inventory system, Expert Systems with Applications 38(10), 12051–12057.

Fallah-Jamshidi, N. Karimi, M. Zandieh (2011), A hybrid multi-objective genetic algorithm for planning order release date in two-level assembly system with random lead times, Expert Systems with Applications 38(11), 13549-13554.

Behnamian, M. Zandieh (2011), A discrete colonial competitive algorithm for hybrid flowshop scheduling to minimize earliness and quadratic tardiness penalties, Expert Systems with Applications 38(12), 14490-14498.

A.R. Boloori Arabani, M. Zandieh, S.M.T. Fatemi Ghomi (2011), Multi-objective genetic based algorithms for a cross-docking scheduling problem, Applied Soft Computing 11(8), 4954-4970.

Behnamian, S.M.T. Fatemi Ghomi, M. Zandieh (2012), An ACO, SA and VNS hybrid algorithm for hybrid flowshops scheduling with sequence-dependent setup times, Expert Systems29(2), 156-169.

Vahdani, R. Tavakkoli-Moghaddam, M. Zandieh, J. Razmi (2012), Vehicle routing scheduling using an enhanced robust hybrid optimization approach, Journal of Intelligent Manufacturing23(3), 12, 759-774.

Sakiani, S.M.T. Fatemi Ghomi, M. Zandieh (2012), Multi-objective supply planning for two-level assembly systems with stochastic lead times, Computers and Operations Research39(7), 1325-1332.

Hakimzadeh Abyaneh, M. Zandieh (2012), Bi-objective hybrid flowshop scheduling with sequence-dependent setup times and limited buffers, International Journal of Advanced Manufacturing Technology58, 309-325.

A.R. Boloori Arabani, M. Zandieh, S.M.T. Fatemi Ghomi (2012) A cross-docking scheduling problem with sub-population multiobjective algorithms, International Journal of Advanced Manufacturing Technology 58, 741-761.

S.H.A. Rahmati, M. Zandieh (2012), A new biogeography-based optimization (BBO) algorithm for the flexible Job shop scheduling problem, International Journal of Advanced Manufacturing Technology 58(9-12), 1115-1129.

Mosadegh, M. Zandieh, S.M.T. Fatemi Ghomi (2012), Simultaneous solving of balancing and sequencing problems with station-dependent times for mixed-model assembly lines, Applied Soft Computing12, 1359-1370.

Pargar, M. Zandieh (2012), Bi-criteria SDST hybrid flow shop scheduling with learning effect of setup times: Water flow-like algorithm approach, International Journal of Production Research50(10), 2609-2623.

S.M. Mousavi, M. Zandieh, M. Amiri (2012) Comparisons of bi-objective genetic algorithms for the hybrid flowshop scheduling with sequence-dependent setup times, International Journal of Production Research 50(10), 2570-2591.

Ayough, M. Zandieh, H. Farsijani (2012), GA and ICA approaches to job rotation problem considering employee’s boredom, International Journal of Advanced Manufacturing Technology60 (5-8), 651-666.

Mosadegh, S.M.T. Fatemi Ghomi, M. Zandieh (2012), Simultaneous solving of balancing and sequencing problems for mixed-model assembly lines in JIT systems, International Journal of Production Research, 50(18) 4994-5016.

Kayvanfar, M. Zandieh (2012), The economic lot scheduling problem with deteriorating items and shortage: An imperialist competitive algorithm, International Journal of Advanced Manufacturing Technology62, 759-773.

Rabiee, P. Ramezani, M. Zandieh (2012), Bi-objective partial flexible job shop scheduling problem: NSGA-II, NRGA, MOGA and PAES approaches, International Journal of Production Research 50(24), 7327-7342.

Iranpoor, S.M.T. Fatemi Ghomi, M. Zandieh (2012), Machine scheduling in the presence of sequence-dependent setup times and a rate-modifying activity, International Journal of Production Research 50(24), 7401-7414.

Rabiee, M. Zandieh, A. Jafarian (2012), Scheduling of no-wait two machine flow shop with sequence-dependent setup times and probable rework using robust metaheuristics, International Journal of Production Research 50(24), 7428-7446.

Karimi, S.H.A. Rahmati, M. Zandieh (2012), An efficient knowledge-based algorithm for the flexible job shop scheduling problem, Knowledge-Based Systems36, 236-244.

S.H.A. Rahmati, M. Zandieh (2013), Developing two multi-objective evolutionary algorithms for the multi-objective flexible job shop scheduling problem, International Journal of Advanced Manufacturing Technology 64(5-8), 915-932.

Moradi, M. Zandieh (2013), An imperialist competitive algorithm for a mixed-model assembly line sequencing, Journal of Manufacturing Systems 32(1), 46-54.

S.M. Mousavi, M. Mousakhani, M. Zandieh (2013), Bi-objective hybrid flow shop scheduling: A new local search, International Journal of Advanced Manufacturing Technology 64, 933-950.

Akbari, M. Zandieh, B. Dorri (2013), Scheduling part-time and mixed skills workers to maximize employee satisfaction, International Journal of Advanced Manufacturing Technology 64(5-8), 1017-1027.

Behnamian, M. Zandieh (2013), Earliness and tardiness scheduling on hybrid flowshop with position-dependent learning effects by hybrid metaheuristics, The Arabian Journal for Science and Engineering 38(5), 1229-1242.

Fadaei, M. Zandieh (2013), Scheduling a bi-objective hybrid flow shop with sequence-dependent family setup times using meta-heuristics, The Arabian Journal for Science and Engineering 38(5), 2233–2244.

A.H. Banisadr, M. Zandieh, I. Mahdavi (2013), A hybrid imperialist competitive algorithm for single machine scheduling problem with linear earliness and quadratic tardiness penalties, International Journal of Advanced Manufacturing Technology 65(5-8), 981-989.

S.M. Mousavi, M. Zandieh, M. Yazdani (2013) A simulated annealing/local search to minimize the makespan and total tardiness on a hybrid flowshop, International Journal of Advanced Manufacturing Technology 64, 369-388.

Iranpoor, S.M.T. Fatemi Ghomi, M. Zandieh (2013), Due-date assignment and machine scheduling in a low machine-rate situation with stochastic processing times, Computers and Operations Research 40(4), 1100-1108.

Nourmohammadi, M. Zandieh, R. Tavakkoli-Moghaddam (2013), An imperialist competitive algorithm for multi-objective U-type assembly line design, Journal of Computational Science 4(5), 393–400.

Khajehvand, H. Pedram, M. Zandieh (2013), SCTTS: Scalable Cost-Time Trade-off Scheduling for Workflow Application in Grids, KSII Transactions on Internet and Information Systems 7(12), 3096–3117.

RahmaniM. HeydariA. Makui, M. Zandieh, (2013), A new approach to reducing the effects of stochastic disruptions in flexible flow shop problems with stability and nervousness, International Journal of Management Science and Engineering Management 8(3), 173-178.

Kayvanfar, G.H.M. Komaki, A. Aalaei, M. Zandieh (2014), Minimizing Total Tardiness and Earliness on Unrelated Parallel Machines with Controllable Processing Times, Computers and Operations Research 41(1), 31–43.

Iranpoor, S.M.T. Fatemi Ghomi, M. Zandieh (2014), Order acceptance and due-date quotation in low machine rates, Applied Mathematical Modelling 38(7-8), 2063-2072.

Naderi, M. Zandieh (2014), Modeling and scheduling no-wait open shop problems, International Journal of Production Economics 158, 256-266.

Naderi, M. Zandieh, M. Yazdani (2014), Polynomial time approximation algorithm for proportionate open shop scheduling, International Transactions in Operational Research 21(6), 1031-1044.

Behnamian, S.M.T. Fatemi Ghomi, M. Zandieh (2014), Realistic variant of just-in-time flowshop scheduling: Integration of Lp-metric method in PSO-like algorithm, International Journal of Advanced Manufacturing Technology 75(9-12), 1787-1797.

Yazdani, M. Zandieh, R. Tavakkoli-Moghaddam, F. Jolai (2015), Two meta-heuristic algorithms for the dual-resource constrained flexible job-shop scheduling problem, Scientia Iranica E 22(3), 1242-1257.

106-E. Yadegari, H. Najmi, M. Ghomi-Avili, M. Zandieh (2015), A Flexible Integrated Forward/Reverse Logistics Model with Random Path-based Memetic Algorithm, Iranian Journal of Management Studies 8(2), 287-313.

Fattahi, P. Samouei, M. Zandieh (2016), Simultaneous Multi-Skilled Worker Assignment and Mixed-Model Two-Sided Assembly Line Balancing, International Journal of Engineering: Transaction B: Applications 29(2), 211-221.

Zandieh, A. Chensebli (2016), Reverse logistics network design: A water flow-like algorithm approach, OPSEARCH 53(4), 667-692.

Seidgar, M. Zandieh, H. Fazlollahtabar, I. Mahdavi (2016), Simulated ICA in Two-Stage Assembly Flow-shop with Machines’ Breakdowns and Preventive Maintenance, Journal of Engineering Manufacture 230(5), 934-953.

Teymourian, V. Kayvanfar, G.H.M. Komaki, M. Zandieh (2016), Enhanced intelligent water drops and cuckoo search algorithms for solving the capacitated vehicle routing problem, Information Sciences 334, 354-378.

Ahmadi, M. Zandieh, M. Farrokh, S.M., Emami (2016), A multi-objective optimization approach for flexible job shop scheduling problem under random machine breakdown by evolutionary algorithms, Computers and Operations Research 73, 56-66.

Seidgar, M. Zandieh, I. Mahdavi (2016), Bi-objective optimization for integrating production and preventive maintenance scheduling in two-stage assembly flow shop problem, Journal of Industrial and Production Engineering 33(6), 404-425.

Zandieh, M.B. Abiri, S.H.A. Rahmati (2016), Bi-objective scheduling of real flexible flow lines: A gradual transition tabu search approach, Production Engineering 10(4-5), 477-488.

Khishtandar, M. Zandieh (2017), Comparisons of some improving strategies on NSGA-II for multi-objective inventory system, Journal of Industrial and Production Engineering 34(1), 61-69.

Zandieh, M. Roumani (2017), A biogeography-based optimization algorithm for order acceptance and scheduling, Journal of Industrial and Production Engineering 34(4), 312-321.

Hêriş Golpîra, M. Zandieh, E. Najafi, S. Sadi-Nezhad (2017), A multi-objective, multi-echelon green supply chain network design problem with risk-averse retailers in an uncertain environment, Scientia Iranica E 24(1), 413-423.

Kayvanfar, M. Zandieh, E. Teymourian (2017), An intelligent water drops algorithm to identical parallel machines scheduling with controllable processing times: A JIT approach, Computational and Applied Mathematics 36(1), 159-184.

Hêriş Golpîra, E. Najafi, M. Zandieh, S. Sadi-Nezhad (2017), Robust bi-level optimization for green opportunistic supply chain network design problem against uncertainty and environmental risk, Computers and Industrial Engineering 107, 301-312.

Zandieh, A.R. Khatami, S.H.A. Rahmati (2017), Flexible job shop scheduling under condition based maintenance: Improved version of imperialist competitive algorithm, Applied Soft Computing 58, 449-464.

Khishtandar, M. Zandieh, B. Dorri (2017), A multi criteria decision making framework for sustainability assessment of bioenergy production technologies with hesitant fuzzy linguistic term sets: The case of Iran, Renewable and Sustainable Energy Reviews 77, 1130-1145.

Zandieh, M. N. Joreir-Ahmadi, A. Fadaei-Rafsanjani (2017), Buffer allocation problem and preventive maintenance planning in non-homogenous unreliable production, International Journal of Advanced Manufacturing Technology 91(5-8), 2581-2593.

Amirtaheri, M. Zandieh, B. Dorri, A.R. Motameni (2017), A bi-level programming approach for production-distribution supply chain problem, Computers and Industrial Engineering 110, 537-527.

Zaheri, M. Zandieh, M.T. Taghavifard (2017), Bi-level Programming for Supplier Selection under Quantity Discount Policy, Scientia Iranica E 24(4), 2095-2104.

Zandieh, S.M. Sajadi, R. Behnoud (2017), Integrated production scheduling and maintenance planning in a hybrid flow shop system: A multi-objective approach, International Journal of System Assurance Engineering and Management 8(2), 1630-1642.

Hemmati, M. Amiri, M. Zandieh (2018), Optimization Redundancy Allocation Problem with non-exponential repairable components using Simulation approach and Artificial Neural Network, Quality and Reliability Engineering International 34(3), 278-297.

S.M. Mousavi, I. Mahdavi, J. Rezaeian, M. Zandieh (2018), An efficient bi-objective algorithm to solve re-entrant hybrid flow shop scheduling with learning effect and setup times, Operational Research 18(1), 123-158.

Amirtaheri, M. Zandieh, B. Dorri (2018), A bi-level programming model for decentralized manufacturer-distributer supply chain considering cooperative advertising, Scientia Iranica E 25(2), 891-910.

Pargar, M. Zandieh, O. Kauppila, J. Kujala (2018), The effect of worker learning on scheduling jobs in a hybrid flow shop: a bi-objective approach, Journal of Systems Science and Systems Engineering 27(3), 265-291.

S.M. Mousavi, I. Mahdavi, J. Rezaeian, M. Zandieh (2018), Bi-objective scheduling for re-entrant hybrid flow shop with learning effect and setup times, Scientia Iranica E 25(4), 2233-2253.

Shahinmoghaddam, A. Nazari, M. Zandieh (2018), CA-FCM: a Context-Aware Fuzzy Cognitive Mapping approach to imitate the intuitive causal judgments over change causation within construction projects, Advanced Engineering Informatics 38, 620-638.

Zandieh, S. Motallebi (2018), Determination of production planning policies for different products in process industries using discrete event simulation, Production Engineering 12(6), 737-746.

S.M. Mousavi, M. Zandieh (2018), An efficient hybrid algorithm for a bi-objectives hybrid flow shop scheduling, Intelligent Automation and Soft Computing 24(1), 9-16.

Yadegari, A. Alem-Tabriz, M. Zandieh (2019), A Memetic Algorithm with a Novel Neighborhood Search and Modified Solution Representation for Closed-loop Supply Chain Network Design, Computers and Industrial Engineering 128, 418-436.

S.M. Mousavi, M. Tavana, N. Alikar, M. Zandieh (2019), A tuned hybrid intelligent fruit fly algorithm for fuzzy rule generation and classification, Neural Computing and Applications 31(3), 873-885.

Moradi, A. Ayough, M. Zandieh (2019), Integrated process planning and active scheduling in a supply chain-A learnable architecture approach, Iranian Journal of Management Studies 12(2), 133-159.

Zandieh (2019), Scheduling of virtual cellular manufacturing systems: A biogeography-based optimization algorithm, Applied Artificial Intelligence 33(7), 594-620.

Behmanesh, M. Zandieh, S.M. Hadji Molana (2019), The surgical case scheduling problem with fuzzy duration time: An ant system algorithm, Scientia Iranica E 26(3), 1824-1841.

Rezaei, S. Shokouhyar, M. Zandieh (2019), A neural network approach for retailer risk assessment in the aftermarket industry, Benchmarking: An International Journal 26(5), 1631-1647.

Yazdani, M. Zandieh, R. Tavakkoli-Moghaddam (2019), Evolutionary algorithms for multi-objective dual-resource constrained flexible job-shop scheduling problem, OPSEARCH 56(3), 983-1006.

Nourmohammadi, M. Fathi, M. Zandieh, M. Ghobakhloo (2019), A water-flow like algorithm for solving U-shaped assembly line balancing problems, IEEE Access 7, 129824-129833.

Behmanesh, M. Zandieh (2019), Surgical case scheduling problem with fuzzy surgery time: An advanced bi-objective ant system approach, Knowledge-Based Systems 186, 104913.

Zandieh, B. Aslani (2019), A hybrid MCDM approach for order distribution in a multiple-supplier supply chain: a case study, Journal of Industrial Information Integration 16, 100104.

Khanmohammadi, B. Malmir, H. Safari, M. Zandieh (2019), A new approach to strategic objectives ranking based on fuzzy logarithmic least squares method and fuzzy similarity technique, Operations Research Perspectives 6(-), 100122.

A.S. Mohammadi, A. Alem-Tabriz, M.S. Pishvaee, M. Zandieh (2020), A multi-stage stochastic programming model for sustainable closed-loop supply chain network design with financial decisions: A case study of plastic production and recycling supply chain, Scientia Iranica E 27(1), 377-395.

Alavi, M. Zandieh, S.E. Najafi, S.M. Sajadi (2020), Analyzing the development of the third-generation biodiesel by a novel hybrid decision-making method: The case of Iran, Energy 195(-), 116895.

Behmanesh, M. Zandieh, S.M. Hadji Molana (2020), Multiple resource surgical case scheduling problem: Ant colony system approach, Economic Computation and Economic Cybernetics Studies and Research 54(1), 251-268.

Yazdi, M. Zandieh, H. Haleh (2020), A mathematical model for scheduling elective surgeries for minimizing the waiting times in emergency surgeries, International Journal of Engineering: Transaction C: Aspects 33(3), 448-458.

Ayough, M. Zandieh, F. Farhadi (2020), Balancing, sequencing and job rotation scheduling of a U-shaped lean cell with dynamic operator performance, Computers and Industrial Engineering 143(-), 106363.

Badin-Dahesh, Gholamali Tabarsa, M. Zandieh, M.R. Hamidizadeh (2020), Reviewing the intellectual structure and evolution of the innovation systems approach: A social network analysis, Technology in Society 63(-), 101399.

Seidgar, H. Fazlollahtabar, M. Zandieh (2020), Scheduling two-stage assembly flow shop with random machines breakdowns-integrated new self-adapted differential evolutionary and simulation approach, Soft Computing 24(11), 8377-8401.

Sohrabi, M. Zandieh, B. Afshar-Nadjafi (2021), A dynamic demand-centered process-oriented data model for inventory management of hemovigilance systems: A case analysis, Healthcare Informatics Research 27(1), 73-81.

Ayough, F. Farhadi, M. Zandieh, P. Rastkhadive (2021), Genetic Algorithm for Obstacle Location-Allocation Problems with Customer Priorities, Journal of Industrial and Management Optimization 17(4), 1753-1769.

S.S. Hosseini, P. Azimi, M. Sharifi, M. Zandieh (2021), A New Soft Computing Algorithm Based on Cloud Theory for Dynamic Facility Layout Problem, RAIRO Operations Research 55, S2433-S2453.